Level of completion

Apartments will be finished to BDS /Bulgarian Government Standard/

 

  1. 1. Walls – internal and external – brickwork.
  2. 2. Facade solution:

2.1. To elevation +/-0.00 – facing stone;

2.2. Above elevation +/-0.00 – smooth silicate plaster;

2.3. External window frames – 5-chamber PVC window frames;

2.4. Railings as per architectural detail.

 

  1. 3. Common parts:

3.1. Staircases and corridors: floor – granite, walls – gypsum plaster/latex or cement plaster/glass ceramics, ceiling – gypsum plaster, latex;

3.2 El. installation: ordinary switches and lighting fixtures;

3.3. Electric lock on the entrance door of the building.

 

  1. 4.Apartment:

4.1. Walls – gypsum plaster;

4.2. Ceiling – gypsum plaster;

4.3. Flooring: corridor, bedroom and living room – leveled concrete slab.

4.4. Balconies of apartments: flooring – granite or double flooring or artificial grass.

4.5. Interior doors – not installed.

4.6. Entrance door of the apartment – installed.

4.7. Plumbing – “on plugs”.

 

  1. 5. Sanitary facilities:

5.1 floor – cement screed.

5.2 walls – lime-cement plaster.

5.3 ceiling – concrete slab.

 

  1. installation:

apartments – switches, contacts, sockets – ordinary, set with light bulbs.

 

  1. Underground parking space:

7.1. Floor – concrete slab, concrete walls.

7.2. Entrance door for the entire parking lot – roller shutter with remote control.

7.3. One remote control for garage door /barrier/.